Christchurch Justice & Emergency Services Precinct
Backup-power control and generator start-up synchronisation for a critical Christchurch precinct.

Backup power for a critical site
The Christchurch Justice & Emergency Services Precinct brings together services where continuity of power matters. Skyward installed the backup control system connecting multiple generator sets with the site’s mains supply.
Coordinating the generators
ComAp paralleling controllers coordinate generator start-up and synchronisation when mains power is unavailable. The controls also manage synchronisation and transfer back to mains when the supply returns.
The project brings together three connected tasks:
- Starting and synchronising multiple generator sets.
- Coordinating backup supply during a mains outage.
- Transferring the site back to mains power.
A complete control sequence
Good standby power depends on more than a generator starting. The controls need to coordinate the sources, switching and return to normal supply as one system.
Explore generator synchronisation or discuss your site with Tim.