Tongatapu Power Station Upgrade

Generator control upgrades and commissioning work at Tongatapu Power Station in Tonga.

LocationTongatapu, TongaSectorPower generation
Tongatapu Power Station control-upgrade case study image.

Updating an island power station

Skyward is supporting the generator and power-system controls upgrade at Tongatapu Power Station in Tonga. The work brings new control equipment together with existing engine systems.

Connecting new controls to existing equipment

The initial upgrade scope replaces Woodward DSLC controllers with ComAp InteliGen 1000 controllers, and Kato voltage regulators with Leroy-Somer D550 units.

The InteliGen 1000’s Modbus master capability communicates with an existing Monico CAT ECU gateway. This connects the new generator controls with engine data already available on site.

Commissioning and the next station build

Two QSK generators have been commissioned at Tongatapu. A new power station build is also underway, continuing the island’s generation development.

Explore ComAp controls or discuss a generation control upgrade.